We’re Getting CLOSE to completion!

Wow, it seems every day new things happen and I just can’t wait until it’s all done!  Here’s what has happened lately:

Measurements for closet rods/shelves

Measurements for Garage door installation

Cabinets are in, Counters are a-comin’!

Bathroom vanities have been installed (see pics)

 

2015-05-12 18.43.03 2015-05-12 18.42.20 2015-05-12 18.41.52

Shower door and mirrors are ordered.

Waiting on one tiny sheetrock repair and then off to the paint wars!

Then install mirrors & Shower doors & Garage door

Then flooring….

Lighting, final electrical and final plumbing…

Inspection… Move in!  Hahaha!  I’m sure I’m forgetting something incredibly important, but so far, this is all I can think of… been running around like a crazy person dotting all my “T’s” and crossing all my “I’s”!

I’ve done a craigslist ad for the rental on this unit… hopefully we’ll be done within the month! So excited.

Author: JanneZack

I grew up in Memphis TN, got a bit tired of humidity, so moved to New Mexico for College and then to Utah with a job change. I began working with an Architect there, and decided to change careers. I moved back to Memphis to apprentice in the Residential Home Design field. Now, almost 18 years later, I design custom homes which are built all over the United States. I LOVE what I do.